Knowles Field House

Knowles 1-12-2017

Work on the existing Knowles Field House was more limited than other parts of the project and occurred from May 2, 2016-June 17, 2016. Fire protection, additional doors, a runoff area for the track, and the painting of the existing ductwork. The existing track is scheduled to be resurfaced in August 2019.